Question :
What is the standard lead time for parts that are on back order?
 
Answer :
Parts from different manufacturers have different lead times based on the standard delay from a particular manufacturer. The standard lead times are usually accurate, but can change based on a few different factors.

You can see the standard lead times for the manufacturers that we carry parts for here:

Adaptec: 7-10 Days
AVision: 7-10 Days
Bell & Howell: 30-45 Days
Canon: 7-10 Days
Fujitsu: 30-45 Days
Kodak: 5-7 Days
Kofax: 7-10 Days
Panasonic: 7-10 Days
Ricoh: 7-10 Days

These are the average lead times. If you would like a more precise lead time for particular parts, please contact us.